leiderdorp

November, 2022

6.700 M2 Statenhof Leiderdorp

Get ready to perform

ICM Projects fitted the Statenhof student complex with 6,700 m2 of beautiful PVC flooring with shock plinth (plastic skirting). Our guys sometimes say: 'Good preparation is half the work'. That's why we started with the basics on this project. We sanded the concrete subfloors flat and leveled them using a pump, so that the underfloor heating could easily be milled in and sealed.

Also curious what we can do for your project? Drop by soon for a cup of coffee!

Back 2 top