groningensingel51

December, 2021

11.000 M2 Groningensingel 51 Arnhem

Get ready to perform

During the execution of this project we were able to show our best side. We had several challenges; for example, there was only one elevator present while we were working with many workmen at the same time, and the existing subfloors were in very bad shape. Before we could level them, we first repaired them. Then we fitted the 200-plus apartments with loose lay PVC strips, the general corridors were carpeted and the various outdoor areas were fitted with PMMA. But that's not all, in the gym we made a sports floor. Cool to be able to use so many different techniques in one project.

Do you also have a challenge for us? Let us know and we can get started right away!