moeskops

October, 2022

102 M2 Bakkerij Moeskops

Get ready to perform

Because of the old floor that was here, it became another challenge. The old floor was full of dilation points and several cracks. We also had to take into account the HACCP guidelines. The end result: a beautiful cast floor with flakes that is also scratch resistant! A perfect solution for Moeskops Bakery.

With us, your project is assured of the perfect solution. Also curious what we can do for your project? Then contact us quickly.

Contact
IMG_7420
IMG_7426_1
IMG_7447
IMG_7456
IMG_7459
IMG_7471
IMG_7479
Back 2 top